BOP Daily Visual Inspection

Daily Category I visual per Nordic PM Plan 9.0 Table 2. BOPE testing per 20 AAC 25.035(e)(10) and API Std 53.

📋 Inspection Information
✅ BOP Visual Inspection Checklist
Annular Preventer
Annular preventer body - no visible damage or leaks
Annular closing unit connections secure
Annular element condition (if visible)
Ram Preventers
Pipe ram preventer body - no visible damage
Pipe ram bonnets secure and no leaks
Blind/shear ram preventer body - no visible damage
Blind/shear ram bonnets secure and no leaks
Ram locks/indicators in correct position
Ram preventer hydraulic connections secure
Variable bore rams (VBR) condition (if equipped)
BOP Stack
BOP stack flanges - no visible leaks
BOP stack studs/bolts tight and in good condition
Stack alignment appears correct
Kill & Choke Lines
Kill line connections secure - no leaks
Choke line connections secure - no leaks
Kill/choke valves operational and positioned correctly
Kill/choke manifold in good condition
Hydraulic System
Hydraulic hoses - no visible damage or leaks
Hydraulic fittings secure
Accumulator pressure within range
Control pod connections secure
Control Systems
Driller's panel accessible and functional
Remote panel accessible and functional
Pressure gauges readable and in range
Control panel indicators operational
Flow Control
Choke manifold condition acceptable
Mud gas separator (poor boy) in good condition
Flare/vent lines clear and properly secured